Quantcast
Channel: All BladeSystem - General posts
Viewing all articles
Browse latest Browse all 1655

Re: Configuring 1Gb PassThru mezzanine ports

$
0
0

There is nothing to configure, each port of the interconnect is directly wired to the LOM on the blade, port no. = bay no. , so you need a cable for each blade at least, better two for redundancy.


Viewing all articles
Browse latest Browse all 1655

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>